Shenzhen, China · From files to finished boards

Turnkey PCB Assembly.
Start with a clearer build plan.

Bring your board files, BOM and production requirements together. Define what gets sourced, built and tested before your project moves forward.

Full turnkey · Partial turnkey · Consigned assembly
Contact: [email protected]

Populated green circuit boards with surface-mount components and connectors
Every build starts with the details.One revision. Clear responsibilities. An agreed scope.
Shenzhen, China
Materials responsibility
Inspection & test scope
Quantity & delivery planning

See what shapes
your assembly cost.

Explore a planning range for boards, components, assembly and testing. An exact quote needs your actual design files and parts list.

Illustrative model · USD

Example rates — awaiting supplier calibration. These results are not this supplier’s prices.

Explore your budget

Enter board and assembly details, then calculate a scenario.

Excludes freight, tax, duties, fixtures, firmware and qualification. Components cannot be priced accurately from BOM lines alone.

Model and reference allowances

The steel stencil allowance follows the public PCBSync planner: USD 35 for a single-side set or USD 60 for a double-side set. Its illustrative 12% spread is also used for the unconfirmed processing allowances. These references are not verified selling prices. Other default values are editable planning assumptions, not PCBSync prices. Enter known PCB, component and test costs to replace those assumptions.

SMT and THT inputs here count solder joints, unlike placement-based tools. A reused or supplied stencil has no new-stencil allowance in this model, but must still pass revision and condition checks.

Get exact quote ↗

An estimate is a planning aid. It is not a purchase price, inventory confirmation or delivery commitment. A component’s manufacturer part number and quantity matter more than BOM line count alone.

Your design files.
A coordinated
assembly scope.

Turnkey PCB assembly is a manufacturing arrangement in which a supplier coordinates bare-board fabrication, component procurement and assembly from a customer’s released design files. Inspection, functional testing, programming and shipping must be specified in the quotation; the word “turnkey” does not define those details by itself.

You remain responsible for the design intent and for approving changes. A useful handoff names the PCB revision, BOM revision, acceptable alternates, assembly quantities and acceptance criteria. This gives purchasing and production the same reference point.

The model can suit a prototype, a small production batch or a repeat build. The right choice depends on who already owns the materials, which components are difficult to obtain, and how much purchasing coordination your team wants to retain.

When comparing suppliers, review how fabrication and material sourcing fit into an assembly order, then check that the written quotation describes the same scope you need.

Who supplies what?

Full, partial and consigned assembly describe material ownership. They do not replace an inspection plan or a controlled release.

Full turnkey, partial turnkey and consigned PCB assembly comparison
ResponsibilityFull turnkeyPartial turnkeyConsigned
Bare PCBsSupplier procures to your approved files.Assign to you or the supplier in writing.You normally supply the boards.
ComponentsSupplier sources the released BOM.You provide selected items; the supplier sources the rest.You provide a complete, labeled kit.
Useful whenYou want a coordinated purchasing and build scope.You hold critical parts or have existing supply agreements.You have a complete kit and control procurement.
Resolve firstAlternates, stock availability, MOQ and excess ownership.The owner and arrival date of every material line.Kit completeness, packaging, overage and shortages.
Shared requirementConsistent revisions, approved substitutions, agreed test coverage and a written definition of completion.

Partial turnkey is useful when a long-lead processor, custom connector or customer-controlled part is already in your inventory. Document the split in the BOM rather than relying on email descriptions. For consigned kits, list actual quantities delivered, required attrition allowance, moisture-sensitive handling instructions and the disposition of unused material.

A / FIRST BUILD

Prototype assembly

Use a small build to resolve file issues, confirm component orientation and define a practical test procedure. Separate a first-article approval from the balance of the order when needed.

Prepare your release files →
B / REPEAT RELEASE

Low volume production

Keep the BOM, approved alternates and work instructions under revision control. Recheck availability for every new order instead of assuming a prior quote remains valid.

Review build requirements →
C / TIME-SENSITIVE BUILD

Quick turn assembly

A short placement schedule helps only when boards, parts and approvals are ready. Work backwards from the date you need usable, tested assemblies in hand.

Plan the critical path →

Explore full turnkey, partial turnkey and consigned assembly, or browse all assembly services.

From release package
to finished assembly.

Agree the output of each stage before committing to the next.

  1. Review files

    Resolve revision mismatches, DFM questions, polarity and missing assembly notes.

  2. Source parts

    Confirm exact part numbers, procurement owners, alternates and arrival dates.

  3. Fabricate PCBs

    Release the stackup, material, finish, tolerances and panel requirements.

  4. Assemble

    Plan SMT, through-hole and any manual steps against approved instructions.

  5. Inspect & test

    Apply the agreed inspection coverage, programming and functional test limits.

  6. Pack & ship

    Confirm labeling, ESD packaging, quantity records and shipping responsibility.

Make capability
a project-level check.

Send the requirements that determine build feasibility. Numeric limits and available processes should be confirmed against the actual assembly.

Build parameterInclude in your requestWhat must be confirmed
PCB constructionDimensions, layers, stackup, thickness, material, copper weight and finish.Fabrication limits, tolerances and panel arrangement.
SMT assemblySmallest package, fine-pitch parts, placement count and populated sides.Placement feasibility, stencil strategy and reflow requirements.
Through-holeInsertion quantity, connector drawings, thermal mass and solder requirements.The appropriate soldering process and mechanical support.
BGA and hidden jointsPackage drawings, pitch, moisture sensitivity and inspection requirements.Process suitability and agreed hidden-joint inspection coverage.
Inspection and testingAcceptance class, AOI/X-ray expectations, firmware and functional test procedure.Available equipment, fixture needs, limits and retained records.
Box buildEnclosure drawings, cables, fasteners, labels and final product test instructions.Assembly responsibility, fit checks and final acceptance scope.

Request supporting documentation for any certification your project requires. A general capabilities page or application photograph is not evidence of a specific certification, qualification or test result.

Send your build requirements ↗

See the assembly environment.

Production photographs from our team show equipment, component handling and manual assembly workstations. Include the process and inspection requirements for your board in the project review.

About our Shenzhen team →

Start with the environment
your board will work in.

Application requirements shape the materials, process controls and test evidence. Discuss them at the quotation stage.

Better files.
Fewer open questions.

Keep fabrication, purchasing and placement data on the same revision. Label the release date and identify the point of contact for engineering questions.

Check your file readiness →
  • Gerber files and drill data

    Supply the complete layer set, board outline and drills. Add a fabrication drawing for stackup, finish, thickness and tolerances.

  • Bill of materials

    Include manufacturer, exact manufacturer part number, quantity per board and reference designators. Mark DNP parts and approved alternatives explicitly.

  • CPL / centroid / pick-and-place

    Provide reference, X/Y coordinates, rotation and board side. Define units and origin, and ensure the reference designators match the BOM.

  • Assembly and test instructions

    Show orientation, special handling, programming files and functional test limits. Include fixture information and acceptance criteria where applicable.

  • Commercial build requirements

    State quantity, material supply model, requested delivery date and destination. Identify any separately supplied or long-lead components.

Resolve the unknowns
before the RFQ.

Use these checks to organize your request. They do not replace engineering review, live component availability or a supplier quotation.

PCB Assembly Lead Time Estimator

Estimate a PCB assembly schedule from file review, PCB fabrication, material readiness, assembly and testing. Find the critical material path.

PCB Assembly Quote Scope Comparison

Compare two PCB assembly quotations using the same quantity and cost categories. Identify missing scope before choosing between quoted totals.

Price the same scope.
Then compare suppliers.

PCB assembly cost has several independent drivers: bare-board construction, actual component prices, setup work, placement and soldering, inspection, functional testing and logistics. A low assembly labor figure can still produce a high total when fixtures, programming or material minimums sit outside the quoted scope.

Check the procurement and build details behind a turnkey quotation and create a written list of inclusions for each offer. Compare the same board revision, quantity, test coverage and shipping basis.

When evaluating China versus USA assembly, compare the actual manufacturing locations, communication arrangements, transit time, landed costs and any project-specific sourcing restrictions. Geography alone does not prove quality or determine the total cost. Do not compare an offshore ex-works price with a domestic delivered price without aligning the assumptions.

For a first build, ask how the supplier handles engineering questions, proposed substitutes, incomplete kits and first-article feedback. For repeat production, ask what gets rechecked when components change or a new revision is released. The objective is a quote you can understand and a build scope both parties can follow.

Before you send the files.

What is included in turnkey PCB assembly?

A turnkey arrangement normally coordinates bare-board fabrication, component sourcing and assembly. The quotation must separately identify inspection, functional test, programming, packaging and shipping. Custom fixtures and product qualification should not be assumed to be included.

What is the difference between full, partial and consigned assembly?

In full turnkey, the supplier sources the boards and components. Partial turnkey splits purchasing responsibility between the customer and supplier. In consigned assembly, the customer normally supplies the materials. All three need a controlled file release and an agreed test scope.

Which files do I need for a quote?

Prepare Gerber and drill files, a BOM with manufacturer part numbers and quantities, and a CPL or centroid file with placement coordinates. Add assembly drawings, DNP markings, test instructions, build quantity and delivery requirements. An incomplete package may support an initial discussion but not a firm production commitment.

Can I supply some of the components?

A partial turnkey request can identify customer-supplied components. Mark the purchasing owner, quantity, packaging and expected arrival date on each relevant BOM line. Kit completeness and handling requirements must be reviewed before the assembly schedule is confirmed.

How much does turnkey assembly cost?

The total depends on board construction, order quantity, actual component prices, setup, SMT and through-hole work, inspection and test scope. Use the estimator to explore a budget scenario, then submit the real BOM and design files for an exact quotation. A BOM line count alone cannot establish the component cost.

When does the lead time start?

Define the starting milestone in the quotation. It may depend on approved files, payment, bare boards, a complete component kit and resolved engineering questions. Fabrication and sourcing can overlap, but assembly cannot finish before required materials are available. Shipping time should be shown separately.

Can a prototype use the turnkey model?

Yes, turnkey describes purchasing and coordination responsibility rather than a particular order size. A prototype RFQ should state the first-build quantity, desired test coverage and whether first-article approval is needed before completing the remaining boards. Minimum quantities and feasibility need project-specific confirmation.

Does inspection mean the board has been functionally tested?

No. Visual inspection, AOI and X-ray address defined workmanship or connection questions. Functional testing exercises the board against a written procedure with expected results and limits. Identify who supplies firmware, fixtures, test software and troubleshooting criteria.

What should I ask before choosing a manufacturer?

Ask about file review, component sourcing channels, substitute approvals, inspection coverage, traceability, handling of shortages and first-article feedback. Request evidence for certifications or capability limits relevant to your design, and make sure the quotation names all exclusions.

How should I compare China and USA assembly quotes?

Use the same files, quantities, material ownership, test scope and delivery basis. Compare the manufacturing location, communications, shipping time and total landed cost. Confirm any origin or sourcing restrictions for your project; a supplier's location alone does not demonstrate quality or project suitability.

Put your next build
into focus.

Share your quantity, design files and the decisions you need help resolving. Include your requested delivery date and any parts you will supply.

[email protected]

Only send files you are authorized to share. If you need a confidentiality agreement, arrange it before uploading sensitive design information.

Send your requirements to the website team for review. Fields marked required must be completed.

Your details and files are saved privately for the site team. Read the privacy policy. Files are not sent to PCBSync.

Your next build,
clearly scoped.
Get a Quote ↗