Engineering your next build

Gerber, BOM & CPL File Readiness Checklist

Prepare one controlled release for fabrication, purchasing and placement. Check each item against your actual package, then download a text summary for your team. The checklist does not read or validate the underlying design files.

File readiness checklist — prepare the release

This is a self-check of your release package. It does not inspect Gerber geometry, verify design correctness or approve manufacturing.

0 of 8 items checked.

Use the result in a reviewed RFQ

Keep the board revision, quantity, material ownership and test coverage with the result. Resolve missing values with the team responsible for the build. A planning output is useful context for a conversation; it is not a manufacturing approval or a binding commercial offer.

Your next build,
clearly scoped.
Get a Quote ↗