Engineering your next build
Gerber, BOM & CPL File Readiness Checklist
Prepare one controlled release for fabrication, purchasing and placement. Check each item against your actual package, then download a text summary for your team. The checklist does not read or validate the underlying design files.
File readiness checklist — prepare the release
This is a self-check of your release package. It does not inspect Gerber geometry, verify design correctness or approve manufacturing.
0 of 8 items checked.
Use the result in a reviewed RFQ
Keep the board revision, quantity, material ownership and test coverage with the result. Resolve missing values with the team responsible for the build. A planning output is useful context for a conversation; it is not a manufacturing approval or a binding commercial offer.